FREE Express Delivery Over £30

45 Day Money Back Guarantee

Over 500,000 Satisfied Customers

Rated 4.9/5 for Customer Service

Schwegler Built In Multi System Main Cavity
    Schwegler Built In Multi System Main Cavity
Schwegler Built In Multi System Main Cavity
Schwegler Built In Multi System Main Cavity
    Schwegler Built In Multi System Main Cavity
Schwegler Built In Multi System Main Cavity

About

Details

The Multi-System can be installed in all types of buildings, whether constructed of concrete, brick or timber. Examples include bridges, industrial buildings, houses, church towers and barns.

To meet the needs of various bird species, different types of front panel are available for use with the Main Cavity. This Main Cavity is supplied without a front panel which should be ordered separately (please see below). At a later stage the front panel can be changed, if desired, to accommodate or encourage a different species of bird.

The Multi-System has been used very successfully in major urban conservation projects to assist species which have become very rare. For example, Kestrels are welcome in cities because they help to keep feral pigeons away, and are therefore encouraged to occupy historic buildings in an effort to keep them clean.

Front Panels available for Kestrel, Jackdaw or Swift

Specifications

Siting & Positioning:
Do not install below a height of 5 to 6 m. Take care to choose the side of the building that is not exposed to prevailing winds. Installation depth: This can be varied to meet individual requirements and the type of building construction. Ideally the Main Cavity be set 24 cm into the wall.

Cleaning and Inspection:
The front panels can be easily removed for access. However, cleaning is not essential, which is an important factor when installing on inaccessible places such as bridges, cooling towers, etc.

Entrance hole: See under sec. front panel

Occupants:
Various, depending on front panel

Material:
SCHWEGLER wood-concrete.

Delivery includes:
Nest box without front panel

Colour:
Grey

Dimensions:
Height: 415mm
Width: 445mm
Depth: 415mm

Weight:
28.0 kg

Delivery

Standard* FREE Next Working Day Delivery when you spend £30.00 & above to most of the UK. Some outlying areas including Highlands & Islands may incur a surcharge and delivery can take up to 3 days. 

Live Food orders placed by 1pm are despatched by FREE Royal Mail 1st Class Post direct from supplier and are not counted in your £30 basket total. Allow up to 3 days for 1st Class Post delivery.

Drop Ship Ark Environmental orders (Schwegler and Vivara Pro) are despatched direct from the UK distributors via 3 to 5 Day Delivery. Next day delivery can be arranged and is charged at cost, please ring free phone 0800 085 4865 if required.

Reviews

Schwegler Built In Multi System Main Cavity

Regular price
£174.99
Sale price
£174.99
Regular price
  • Cleaning is not essential
  • Can be installed in a variety of buildings and structures
Out of stock
WOW, that sold fast! Don't worry we have plenty more arriving soon.
3 to 5 Day Delivery
Despatched direct from supplier via 3-5 day service. Next day can be requested at a nominal cost....  Read more
Available to order - Shipped by pallet direct from supplier to mainland UK only

Please enquire via the contact us page for earliest availability
Due to the size and weight of this product it incurs a minimum pallet handling charge of £51.50. We will contact you once you have placed your order to confirm this cost and take payment.

FAQs

Find answers to our most frequently asked questions.

If you cannot find the answer to your query within these FAQ’s please call our customer service team on free phone 0800 085 4865 between 9.00am – 5.00pm Monday to Friday and we’ll be happy to answer your questions.

Read all FAQs

Outside of office hours please complete the form on our Contact Us page and we will respond to your request within 4 hours of our return.